Deconstruction Fire Damaged Arrow Warehouse


Our Projects

Project Overview

Principal Contractor:  AR Demolition Ltd

Volume of site: 18,294.97m2

Volume of waste:   63.64%

Key Work Activities:

  • Controlled demolition of the unsafe structure.
  • Wet & Drop activities.
  • Removal of asbestos waste materials.
  • Onsite licensed asbestos supervision.
  • Administering asbestos air monitoring regime.
  • Installation/ Maintenance of site boundary.
  • Separation of party wall.
  • Disconnection & removal of services.
  • Demolition of all remaining structures.
  • Removal of all abundant waste.

Project Description:

AR Demolition Ltd was awarded the contract to demolish this large warehouse structure following significant fire damage. The structure was of a steel frame construction with a large asbestos cement roof. The fire damage had obliterated all contents and structural components rendering the structure unsafe for access, whilst also presenting an asbestos risk from the burnt out cement roof.

Key Challenges:

With no means of safe access, works were undertaken largely using the ‘wet & drop’ technique involving the use of dust suppression & the mechanical demolition of the structure and the asbestos cement roof. Due to the lack of accurate asbestos information works were also undertaken as licensed asbestos works and a licensed asbestos supervisor on site at all times. A robust risk assessment and surveying strategy was put in place to continually identify and review the potential asbestos risks within the structure.

Key Health and Safety Risks:

  • Risk of Asbestos Fiber Release
  • Uncontrolled Collapse
  • Falling Debris
  • Separation to party wall/adjacent structures
  • Access to the structure
  • Dust, Noise & Vibration
  • Fire/explosion (Inc. gas canisters etc.)

 

We completed the project productively with over 133 background monitoring exercises taking place over the 24 week period. Zero injuries or complaints about our work were recorded and we successfully separated the Party Wall.

More case studies of interest...

Back to case studies

Latest News

Added 26/06/2019

Institute of Demolition Engineers Vice President

In November 2018 Richard Dolman became the IDE Vice President 
"I want to use my new position to help address the skills shortage, inspire a new generation of demolition engineers, to promote ideals throughout our connected sectors and promote safer ways of working in our industry."
 

Read More
Added 17/06/2019

Construction News Awards

AR DEMOLITION SHORTLISTED FOR MAJOR INDUSTRY AWARD

Read More
More News